If plywood bracing is required, then batts are installed before the sheet bracing is completed.   kellyjones00 (593)

– –– ——— –– –

Install floor insulation batts before floor boards. Batts can be suspended on parallel lines of durable plastic cord, or plastic straps, that are wound or stapled along the bottom edge of floor joists, about 100-200mm apart. When installing rockwool batts, always use gloves, glasses, hat and wear old clothes that can be thrown out.   kellyjones00 (593)

– –– ——— –– –


 


 